• International
  • United Kingdom
  • Australia
  • Middle East
  • Ireland
  • France
  • Login
    • Products
      • Acoustical Ceilings
        • Metal Ceilings
          • Custom Ceilings
          • Suspended Ceilings
          • Ceiling Baffles
          • Ceiling Rafts
          • Linear Ceilings
          • Open Cell Ceilings
          • Polynodal Ceilings
          • SAS Mesh
        • Architectural Metalwork
          • Acoustic Wall Systems
          • Prrotective Casings and Panels
          • Service Integration
          • Solar Management
        • Room Comfort
          • Radiant Heating
          • Chilled Ceiling Systems
      • Projects
      • Downloads
        • Metal Ceilings Technical Drawings
          • Suspended Ceilings
          • Ceiling Baffles
          • Ceiling Rafts
          • Linear Ceilings
          • Open Cell Ceilings
          • Trims & Perimeters
          • Perforations
        • Brochures
          • Project Books
            • Data Pages
            • Info Hub
              • Acoustics
              • Environmental Product Declarations
              • Sustainability
              • Environmental Accreditation Statements
              • Insider
              • O&M | COSHH Data Sheets
              • Testing & Standards
              • Manufacturing
              • CEU
              • Services
            • News
            • Careers
            • Contact
            • Products
              • Acoustical Ceilings
              • Metal Ceilings
              • Architectural Metalwork
              • Room Comfort
                • Custom Ceilings
                • Suspended Ceilings
                • Ceiling Baffles
                • Ceiling Rafts
                • Linear Ceilings
                • Open Cell Ceilings
                • Polynodal Ceilings
                • SAS Mesh
                • Acoustic Wall Systems
                • Prrotective Casings and Panels
                • Service Integration
                • Solar Management
                • Radiant Heating
                • Chilled Ceiling Systems
              • Projects
              • Downloads
                • Metal Ceilings Technical Drawings
                • Brochures
                • Project Books
                • Data Pages
                • Suspended Ceilings
                • Ceiling Baffles
                • Ceiling Rafts
                • Linear Ceilings
                • Open Cell Ceilings
                • Trims & Perimeters
                • Perforations
                    • Info Hub
                      Acoustics

                      Acoustics

                      Environmental Product Declarations

                      Environmental Product Declarations

                      Sustainability

                      Sustainability

                      Accreditations

                      Environmental Accreditation Statements

                      Insider

                      Insider

                      O&M / COSHH DATA SHEET

                      O&M | COSHH Data Sheets

                      Testing & Standards

                      Testing & Standards

                      Manufacturing

                      Manufacturing

                      CPD

                      CEU

                      Services

                      Services

                    • News
                    • Careers
                    • Contact
                    Login
                    • International
                    • United Kingdom
                    • Australia
                    • Middle East
                    • Ireland
                    • France
                    • Home
                    • News
                    • Muscat Update
                    Muscat Update.JPG

                    MUSCAT UPDATE

                    Muscat International Airport, the largest project ever to be undertaken in Oman, is nearly ready for take-off!

                    In partnership with Bechtel Enka Joint Venture (BEJV), SAS International has been involved in advising and training contractors on-site since the new build began in 2011. Over 15 SAS designers have worked on the project to meet the design brief of architects COWI – Larsen & Hill International.

                    The extraordinary project has required complex designs, bespoke architectural metalwork and a new micro perforation for acoustic control. Over 140,000m² of SAS products have been installed on the project including cargo terminals, concourse, ancillary buildings, escalators and the airport hotel.

                    The mammoth project has some impressive stats and facts to offer:

                    97m high, the air traffic control tower is the tallest manmade structure in Oman.

                    There will be 96 check-in counters with the capacity to process 12 million passengers annually.

                    The airport will be capable of landing the new A380 Air Bus.

                    The gross area of the airport building is 345,000m².

                    Click here to get a sneak preview of the project during a visit by the Omani Council of Ministers. An opening ceremony for the North Pier of the airport will take place in September 2017.

                    Legal
                    • Terms & Conditions of Website
                    • Terms & Conditions of Supply of Goods
                    • Cookie Policy
                    • Privacy Policy
                    Quick Links
                    • Contact
                    • About Us
                    • Careers
                    • Modern Slavery Statement 2025
                    • Gender Pay Gap Report 2024
                    Contact Us

                    Address:
                    60 E. 42nd Street
                    Suite 1255
                    New York, NY 10165

                    Phone: +1 646 989 2672

                    © SAS International 2025

                    Created at The Hideout